Show simple item record

dc.contributor.authorÜney-Yüksektepe, Fadime
dc.contributor.authorÇakır, Kübra
dc.contributor.authorYılmaz, Nur
dc.contributor.authorBayrak, Meltem
dc.date.accessioned2020-02-11T13:03:53Z
dc.date.available2020-02-11T13:03:53Z
dc.date.issued2019
dc.identifier25tr_TR
dc.identifier.issn1300-7009
dc.identifier.urihttps://hdl.handle.net/11413/6223
dc.description.abstractBase stations are very important for all GSM operators. Efficient base stations prevent income loss while bringing prestige to the company. This study deals with the problem of transportation planning of portable generators during electricity failure for a leading Turkish GSM operator. There are often electricity failures in a particular area of Mersin which cause not only customer complaints but also income loss for the company. After an electricity failure, a battery steps in for that station. However, the lifetime of battery is limited and sometimes not enough during the failure. In that case, a fixed generator could step in to give service properly. Unfortunately, because of the high cost of fixed generators, not all base stations have a fixed generator. Therefore, the company tries to interfere this problem by using limited number of portable generators. Field operation teams transport and set up these portable generators to the sites with electricity failure before the battery dies. The problem is to schedule the transportation of portable generators to the base stations with electricity failure. In this study, composite dispatching rule, one of the scheduling algorithms, is used to solve this planning problem effectively. An Excel based decision support system has been developed for field operation team. Whenever a failure occurs, after inputting necessary information to the Excel, transportation schedule for each team could be easily obtained by the company experts.
dc.language.isoen_UStr_TR
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/*
dc.subjectScheduling
dc.subjectTeam Planning
dc.subjectTelecommunication
dc.subjectZamanlama
dc.subjectTakım Planlaması
dc.subjectTelekomünikasyon
dc.titleTeam planning under an electricity failure for a GSM operator
dc.typeArticletr_TR
dc.relation.journalPamukkale University of Engineering Sciences - Pamukkale Üniversitesi Mühendislik Bilimleri Dergisitr_TR
local.journal.issue4tr_TR
local.journal.startpage473tr_TR
local.journal.endpage480tr_TR
dc.identifier.wos000483365300014


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 United States
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 United States